P3 Mini House Prefab Mobile Patio from China Suppliers - Quality Factory-built Living Space Solutions
Specifications
| Column structure | Steel structure: 100*100, 80*80, 30*50, 40*80 and other galvanized square tubes are used |
| Ceiling treatment | 1.5 mm waterproof steel plate, thermal insulation rock wool |
| Main material | Main keel: galvanized square tube frame square Keel welding paint: environmentally friendly fluorocarbon spray paint. Wall structure: 1.5 mm galvanized steel plate, metal carved insulation board, anti-corrosion wood board, tempered glass (can be customized according to needs) |
| Floor decoration | 2 mm steel floor, solid wood floor, PVC plastic floor, anti-slip Ceramic tiles (can be customized as required) |
| Configuration facilities | toilet/shower room/distribution box/fluorescent lamp/socket/air conditioner/curtain, etc. (can be customized as required) |
| Scope of application | tourist attractions, parks, squares, resorts, commercial streets, camping bases , farm and other |
| conventional sizes | 3000MM*4000MM*2800mm3000MM*6000MM*2800m (can be customized according to demand) |
| Production cycle | In addition to the spot products of our company, they need to be produced after receiving orders. The production cycle is 12-20 days |
Frequently Asked Questions
The frame is constructed with high-strength galvanized square tubes treated with environmentally friendly fluorocarbon spray paint. Wall options include 1.5 mm galvanized steel plate, metal carved insulation board, anti-corrosion wood board, and tempered glass.
Conventional dimensions include 3000mm x 4000mm x 2800mm and 3000mm x 6000mm x 2800mm. Dimensions, layouts, and configurations can be fully customized based on client requirements.
The interior can be fitted with integrated shower rooms, toilets, power distribution boxes, fluorescent lighting, sockets, air conditioning units, curtains, and various flooring types.
For units not currently in stock, manufacturing commences immediately upon order placement, with an average production lead time of 12 to 20 days.
It is engineered for versatile outdoor deployment, including tourist attractions, holiday resorts, public parks, commercial pedestrian streets, camping bases, squares, and agricultural farm sites.
